Nanjing,China
+86-13813931455(WhatsApp)
sales@hiclover.com

Tag: incinerator

HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.

Large Capacity Animal Dog Cremation HICLOVER Version A1500 with E-Power Automobile. Door

Large Capacity Animal Pet Cremation HICLOVER Model A1500 with E-Power Auto. Door Variation A1500 Inner Dimensions 150 x 100 x 96cm Match for Animal Pet dog pet cat – – – – yes – Dog – yes Pig – – small Cow – – tiny Main Product Listing Main Burning Chamber Added Burning Chamber Mix-Combustion…
Read more

Automatic PLC controller heater plant with Double heat heaters and also twin chamber HICLOVER YD-30C with Damp Scrubber

Item Needs Layout YD-30C Key Product Listing Key Burning Chamber( Main body stainless-steel) Additional Burning Chamber( Key body stainless steel) Mix-Combustion Chamber Wet Scrubber( Laundering Tower)( Text stainless-steel) Heater Control Circumstance Smokeshaft:5.0 Meters *( upgrade to Stainless-steel, complimentary expense) Italy burner: 02 collections Oil Storage Container (if oil gas): 100Liters Automatic PLC controller incinerator plant…
Read more

Medical Waste Burner HICLOVER TS10 PLC 10kgs per human resources

medical waste incinerator iraq price HICLOVER TS10 PLC 10kgs per hour Items/Model TS10( PLC) Image Melt Price Regular 10 kg/hour Feed Capability Requirement 20kg/feeding Control Mode Programmable Reasoning Controller( PLC) Panel Combustion Chamber 100L Indoor Dimensions 50x50x40cm 2nd Chamber 50L Smoke Filter Chamber Yes Feed Setting Handbook Voltage 220V Power 0.5 Kw Oil Usage (kg/hour) standard…
Read more

Waste Incineration HICLOVER Model TS75

Waste Incineration HICLOVER Model TS75  Items/Model TS75( PLC) Photo Concept Waste Incineration Burn Rate Average 75 kg/hour Feed Capability Common 150kg Control Establishing PLC( Programmable Thinking Controller Burner) Burning Chamber 770L Inner Measurements 100x81x95cm Second Chamber 385L Smoke Filter Chamber Yes Feed Setting Manual Voltage 220V Power 0.7 Kw Oil Consumption (kg/hour) Common 16.9 Gas…
Read more

waste incinerator

Burring Ability 100/ 200 KG/ human resources Please develop your deal right here Variety of Heater 02 Nos Please write your bargain here Burner Kind Dual Chamber Main Chamber Secondy Chamber Please compose your deal right here Burner Layout Controlled Air Please compose your offer listed below Gas to be taken advantage of Gas/ Deisel…
Read more

economical incinerators

RECYCLABLE WASTE PLASTIC (NON-PVC) 218,693 CARDBOARD 85,046 PAPER 4,956 PVC 15,115 CONTAMINATED MATERIALS MEDICAL WASTE 1,084 SOLID WASTE POLLUTED WITH HYDROCARBONS 300,680 USED ENGINE OIL FILTERS 85,423 HYDROCARBON-CONTAMINATED DIRTS 88,680 COMMON WASTE FIBERS 14,078 MADE USE OF AIR FILTERS (AUTOMOTIVE AND ALSO ADDITIONALLY SIMILAR) 23,149 INDIVIDUAL PROTECTIVE DEVICES (PPE), CONSISTING OF INFECTED APPAREL AND ALSO…
Read more

Sanctimonious Smoke: The Detraction of Medical Waste Incineration

The middle-class Foxboro course in North Salt Lake City, Utah, is, in a number of techniques, a perfect area for young homes—- brand-new, moderate, likewise sized homes on instead tiny large amounts, neighboring next-door neighbors attached by sidewalks along with streetlights, lots of buddies for all the youngsters. And likewise Mormon communities have lots of…
Read more

laboratory natural waste incineration

1- There are greater than 4000 Cubic Meter sludge are packed in Plastic Bags & & & & maintained more than ten years 2- Cleaning up and also taken care of 2500 Cubic Meters inside the Oil Tank. – – – – the waste is organic as well as originating from laboratory, can be greatly…
Read more

China incinerator

Burner Of Burning Capacity 30 kg/hr = 1 No The Incineration System contains: I. Main Heater with A. Refractory lined Key as well as Added Chamber. B. Refractory lined main billing door as well as ash cleansing door. II i. 1 No. totally automated oil heating unit for major chamber. III.Centrifugal required draft combustion air…
Read more

diesel oil fired medical waste incenerator

Heat Waste Incinerator Layout D. MEGABYTES 750XL Melt Rate-150Kg/ hr minimum Weight( Kg) -4000 kg Added Chamber (double chamber with post-burning) Gas Retention Time 2 2nd Gas Diesel Power Supply for control box 220V-240, solitary phase 50-60Hz Minimum operating temperature degree 1200 oC One year extra parts bundle for full maintainability 10m pipe pipe. 1100…
Read more