Waste Incinerator Operation Room”
Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Waste Incinerator Operation Room, inside with waste incinerator and if necessary, there will be a waste storage room beside.
Items/Model TS30(PLC) TS50(PLC) Burn Rate 30 kg/hour 50 kg/hour Feed Capacity 60kg 100kg Control Mode PLC PLC Combustion Chamber 330L 560L Internal Dimensions 75x75x60cm 100x80x70cm Secondary Chamber 180L 280L Smoke Filter Chamber Yes Yes Feed Mode Manual Manual Voltage 220V 220V Power 0.5Kw 0.7Kw Oil Consumption (kg/hour) 10.2–20 12.1–24 Gas Consumption (m3/hour) 9.8–20 9.9–26.1 Temperature…
Read more
Containerized Incinerator with ISO Container|Mobile Incinerator|Whole Building Dispatch|Up to 100kgs per hour Capacity
Medical Waste Incinerator Items/Model TS100(PLC) Burn Rate Average 100 kg/hour Feed Capacity Average 200 kg/feed Control Mode PLC Combustion Chamber 1200L Internal Dimensions 120x100x100cm Secondary Chamber 600L Smoke Filter Chamber Yes Feed Mode Manual Voltage 220V Power 0.7Kw Oil Consumption (kg/hour) 14–28 Gas Consumption (m3/hour) 10–32.2 Temperature Monitor Yes Temperature Protection Yes Oil Tank…
Read more
Temperature display and program set up (TS Model).
Download Product PDF Format Catalogue: YD Medical Incinerator Catalogue 2013
Nanjing Clover Medical Technology Co., Ltd. is a leading waste incinerator manufacturer in China. We are local manufacturer and one of the largest exporter of China. Pyrolytic incinerator equipment technical is main waste treatment all of the world, for Medical Waste, Animal Incineration, Pet cremation and other Solid wste. The capacity from 10kgs/Hr. to 500kgs/Hr.,…
Read more
university hospital waste administration group at a tertiary care health center,1250 beeded hsopital. our everyday waste developed from all sources is 0.55 kg/bed/day =685kg/day we require an incinerator of 150kg/hour filling up capacity. plz reply with, acquiring, installment, running along with upkeep cost.incinerators, particularly, clinical was heaters The specification of the Heater is as detailed…
Read more
The Professional will supply a Cremation System bundle for 2 (02) Cremators as well as system licensed by associated authority, which need to fit the alloted area as shown on the strategy drawings. As a result of the monetary condition in Bulgaria presently, our researches programs that a 100kg/hour system can fit the demands established…
Read more
requirements are figured out, partially, by exactly just how the land is designated under area government advancement plans (i.e. land usage zoning). Strong waste burners are crafted systems that are qualified of frequently accomplishing melt temperature levels over of 1000oC and likewise a holding time of at the very least one. The incineration of also…
Read more