Where trash will end up is uncertain
Where trash will end up is uncertain After the Baltimore City Council passed clean-air legislation Monday that could force a large trash incineratorto shut down, officials in the city and …
HICLOVER Solution for Fighting COVID-19, with ISO9001/CE Certification.
Where trash will end up is uncertain After the Baltimore City Council passed clean-air legislation Monday that could force a large trash incineratorto shut down, officials in the city and …
Contractor for design, installation and commissioning of an incinerator The appointment of a contractor for the design, installation and commissioning of an incinerator at the Pretoria National Zoological Garden. Minimum …
1, Primary and secondary and mix combustion chamber for pet animal and smoke burning.2, smoke filter chamber for smoke filter3, Stainless steel chimney4, Italy original gas or oil burner, 2 sets total5, Primary combustion chamber inner size is 130 x 70 x 65cm for most of pets animal.6, Fire/Flame Checking Hole optional for check chamber…
Read more
HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project.We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste, medical…
Read more
Incinerator, incineration equipment to burn material you want to burn. most of time, Incinerator for waste burning, including solid waste, liquid waste and gas waste. the Incinerator fuel including oil, gas, coal, wood, etc. the fuel function for start burn, keep waste burn or only keep burn itself to get high temperature. Incinerator request 1/2/3/more…
Read more
HICLOVER, Nanjing Clover Medical Technology Co.,Ltd, supply system solutions for medical environmental protection, animal and pet cremation engineering, other municipal solid waste incineration project. We supply single combustion chamber, double combustion chambers, three combustion chambers and multi-combustion chambers waste incinerators for laboratory, clinic, hospital, medical center, hygiene clinical waste destruction with medical disposable, biological waste,…
Read more
Operational Capabilities PROCESS MINIMUM 1 TON PER DAY OPERATED WITH LIMITED TRAINING REGULAR MAINTENANCE CAN BE COMPLETED WITH LIMITED TRAINING COMPLIES WITH EURO / OR US-EPA EMISSION STANDARDS ABILITY TO BURN WASTE LUBRICANTS (POL) HANDLE ORGANIC SOLIDS (TO INCLUDE RMW) DEPLOYABLE MOBILE 24 HRS OF CONTINUOUS USE AUTOMATIC LOADING SYSTEM AUTOMATED ASH REMOVAL SYSTEM…
Read more
SECTION V TECHNICAL SPECIFICATIONS OF THE INCINERATOR General Description The plant must have four distinct sections that demonstrate three principles of turbulence, residence time and temperature retention. The regulated sections may include but not limited to: Overall plant layout Feed chamber/charging Primary combustion chamber Particulate scrubbers Acid gas The stack/chimney. Minimum…
Read more
Up to 600kgs per ten-hour day of Type IV pathological waste or red bag waste rated at 2200 BTU’s per kg, based on batch loading twice daily. Incinerator, 20 kg/hr Burn Capacity (min. 1200 kgs. Waste Feed Capacity per day) (4-6 hours operations) (Power Supply 380V, 50Hz, 3Ph) Capacity: 30 kg/hr. Number item: 01 unit…
Read more